MUDA-compliant Drawings

Approval-ready drawing sets formatted for Meghalaya Urban Development Authority submission.

Where a project's plot falls under MUDA (Meghalaya Urban Development Authority), the submission drawing set follows MUDA's own format, schedules, and process. MUDA holds the authoritative urban planning boundary — that's where a specific plot's jurisdiction should be verified.

The studio prepares MUDA-formatted drawing sets with the set-back schedules, coverage calculations, and supporting documentation used on our prior MUDA submissions, signed by a Government Registered Technical Person.

What's Included

Deliverables you receive.

01

MUDA-format drawing set

Plans, elevations, sections, site plan, set-back and coverage schedules in the format used on the studio's prior MUDA submissions.

02

Registered technical person sign-off

Drawings that require a registered sign-off are signed by a Government Registered Technical Person.

03

Set-back & coverage calculations

Built-up area, FAR, and set-back calculations formatted for direct review.

04

Structural statement

Coordinated structural drawings / statement where required by the submission.

When It's The Right Fit

Typical contexts.

  • 01When MUDA has been confirmed as the administering authority for your plot
  • 02Submissions requiring MUDA's specific drawing format and schedules
  • 03Projects needing set-back and coverage calculations formatted for MUDA review

Representative Work

Projects this service powered.

View all projects →

FAQ

Practical questions about MUDA-compliant Drawings.

Q01

My plot is inside Shillong but I'm not sure if it's MUDA. How do I confirm?

The MUDA office holds the authoritative urban planning boundary for Shillong. The studio helps verify based on land records and location before drawings begin — but MUDA is the final source.

Q02

Is the MUDA drawing set different from KHADC?

Yes. Title blocks, schedules, and the set-back / coverage calculation format differ. Using the wrong format means re-work. The studio prepares the correct format once the authority is confirmed.

Q03

How long does MUDA approval typically take?

The approval path is with MUDA, not the studio — so timelines are not something we can commit to. Complete and correctly-formatted drawings give a submission its best shot at a clean review cycle.

Further Reading

Relevant guides from the journal.

Read all guides →

Start a Conversation

Interested in muda-compliant drawings?

Share the site, the scope, and roughly where you are in the planning. The studio will reply with a practical next step.